Griffith Street BESS Development Share Print April. 13, 2023 Location: 18800 Broadway APN: 7339-014-009 Applicant: VESI LLC Contact: Jessica Mowry/ORMAT JMowry@ORMAT.COM Staff Contact: 310-952-1761 planning@carsonca.gov Project Update: Submittal: April 13, 2023 Status: Under Review Related Documents: Project Plans Photo-Simulations Project Description: Site Plan and Design Review, Conditional Use Permit, Development Agreement Redevelopment of the approximately 3-acre project site with a Battery Energy Storage System (BESS) and associated infrastructure. Lithium-ion batteries would be stored within modular outdoor enclosures, and power that is released or captured by the batteries would be transferred to and from the SCE Nola Substation via an underground 66-kilovolt generation transmission (gen-tie) line. The proposed project would consist of lithium-ion batteries installed in racks located in prefabricated outdoor enclosures; inverters; medium-voltage transformers; switchgear; a collector substation; and other associated equipment. The proposed facility would provide a service by receiving energy (charging) from the SCE transmission system, storing the energy, and then later delivering energy (discharging) back to the point of interconnection at the SCE Nola Substation. The facilities would operate year-round and would be available to receive or deliver energy 24 hours a day, 365 days a year.