The Building Official will review permitted work for compliance with the requirements of the Building Code, the approved plan and specifications, and that the work matches the permit’s scope of work. Generally, all work will need to be inspected before being finished over. A project is complete once the work covered by the permit has passed the final inspection. All construction or work for which a permit is required shall be subject to inspection by the Building Official and shall remain accessible and exposed for inspection purposes until approved by the Building Official. Plans and specifications, permits, and when provided the inspection record card shall be available at the job site. It shall be the duty of the permit holder to cause the work to remain accessible and exposed for inspection purposes. Neither the Building Official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.
FOR ALL ENGINEERING SERVICES RELATED PERMITS, APPLICANT MUST SCHEDULE FOR AN INSPECTION TWO WORKING DAYS BEFORE THE START OF WORK. FINAL INSPECTION REQUIRED FOR ALL PERMITS.
- Inspections and/ or pre-construction meetings are scheduled TWO working days prior to the start of work.
- Inspection Staff are scheduled Monday-Friday from 8am - 4:30pm.
- Scheduling Staff are available Monday-Thursday from 7am - 6pm.
- You will be contacted via email from Staff within 24 hours.
- Failure to confirm inspection within 24 hours may result in cancellation.
- To cancel inspection, email pwinspection@carsonca.gov by 8am the latest the day of scheduled inspection or call the Construction Inspector Supervisor at (949) 300-4529.
- For emergency jobs, please call the Construction Inspector Supervisor directly at (949) 300-4529.
For all engineering services related permits, applicant shall fill out the form below.
Purpose of Inspection/Work Description (Maximum 256 characters) *
Required
Intended Work Hours *